Tender For corrigendum : fabrication and supply of gaskets for various process equipments like heat exchangers, air coolers, vessels, columns, furnace, reactor, regenerator etc for shutdowns/ unplanned outages at iocl mathura refinery
Tender For supply of points for first year , calibration of glueing m c 8930 by 3 sensor 3 cal points for first year , calibration of vul kettle 8760 by 3 sensor 3 cal points for first year , calibration of hot swaging m c plant no 6229 by 1 sensor 3 cal points for first year , calibration of salt peter n 5 by 3 sensor 3 cal points for first year , calibration of temp gauge by 1 sensor 3 cal points for first year , calibration of gas nitric 35 by 1 sensor 3 cal points for first year , calibration of air circulation by 3 sensor 3 cal pointsfor first year , calibration of high frequency 41 by 1 sensor 3 cal points for first year , calibration of digital graph recorder 1 16 ch without sensor by simulatrion 3 cal points for first year , calibration of hot swill n2 by 1 sensor 3 cal points for first year , calibration of anodising e6 by 1 sensor 1 cal points for first year , calibration of auto film proce 6768 by 1 sensor 3 cal points for first year , calibration of hot air blower 70 by 3 sensor 3 cal points for first year , calibration of hot water anodizing 20 by 1 sensor 3 cal points for first year , calibration of temp control of hot water 02 by 1 sensor 3 cal points for first year , calibration of digital temp. gauge with rtd sensor by 1 sensor 3 cal points for first year , calibration of tvc trolly by 3 sensor 3 cal points for first year , calibration of industrial freezer by 1 sensor 3 cal points for first year , calibration of industrial freezer 2019-14 by 1 sensor 3 cal points for first year , calibration of thermo lab 3c36 and 2c temp and rh measurement by 1 sensor 3 cal points for first year , calibration of oscilation disc rpm measurment for first year , calibration of grese drop point tester 538 1110 by 1 sensor 3 cal points for first year , calibration of quv by 1 sensor 3 cal points for first year , calibration of hot air dryer d1 and d2 by 1 sensor 3 cal points for first year , calibration of hot water cleaning station by 1 sensor 3 cal points for first year , calibration of temp clock for first year , calibration of ir gun up to 500 dec c for first year , calibration of furnace range upto 500 deg c by 1 sensor 3 cal points for second year , calibration of furnace range upto 500 deg c by 3 sensor 3 cal points for second year , calibration of furnace range upto 1250 deg c by 1 sensor 3 cal points for second year , calibration of furnace range upto 1250 deg c by 3 sensor 3 cal points for second year , calibration of furnace range upto 1250 deg c by 6 sensor 3 cal points for second year , calibration of bath range upto 400 deg c by 1 sensor 3 cal points for second year , calibration of bath range upto 400 deg c by 3 sensor 3 cal points for second year , calibration of bath range upto 400 deg c by 6 sensor 3 cal points for second year , calibration of thermometer range upto 100 deg c 3 cal points for second year , calibration of tank range by 1 sensor 3 cal points for second year , calibration of tank range by 3 sensor 3 cal points for second year , calibration of oven range upto 350 deg c by 1 sensor 3 cal points for second year , calibration of oven range upto 350 deg c by 3 sensor 3 cal points for second year , calibration of oven range upto 350 deg c by 6 sensor 3 cal points for second year , calibration of themohygrometer 3 cal points for second year , calibration of hydraulic press range upto 180 deg c by 1 sensor 3 cal points for second year , calibration of hydraulic press range upto 180 deg c by 3 sensor 3 cal points for second year , calibration of chambers furnace range upto 200 deg c by 1 sensor 3 cal points for second year , calibration of chambers furnace range upto 200 deg c by 3 sensor 3 cal points for second year , calibration of //bid details 2 / 81 chambers furnace range upto 200 deg c by 6 sensor 3 cal points for second year , calibration of auto film proce 6760 by 1 sensor 3 cal points for second year , calibration of extrasion mc 6580 by 1 sensor 3 cal points for second year , calibration of spot vulcanising
Tender For supply of interactive panels with cpu (q2) , professional large format display (v2) (q2) , weighing machine , mill house , fully automatic jaggery production unit , solar panel foundation and all related items , structure of complete plant , bought out for complete plan , erection of mill house and boiling house , hdg set , submersible , fire fighting equipment , hcl kit single , oilfree 15 com , air filter , cylinder c2h2 , regulator c2h2 , hood aas , vacuum hot air oven , digital hot air oven , air circulation fan , microprocessor digital temperature indicator , digital timer , heating mantle , digital muffle furnace , single beam uv , double beam uv , digital photo colorimeter , weighing balance , analytical balance cy , water bath , pid temperature controller , atomic absorption spectrophotometer , gas chromatography , fused silica capillary column , gas purification panel , electromechanical voltage stabilizer , carbon steel cylinder , pressure regulator , glassware , servo candy pillopack wrapping machine , horizontal flow wrapepillopack high speed packaging machine , automatic packing machine , vertical single face paper corrugating machine , corrugated sheet pasting machine , eccentric slotter machine , bar rotary cutting creasing machine , stitching machine , paper reel to sheet cutting machine , flexo graphic printing machine , printing machine , manual jar filling machine , manual pouch sealing machine , manual sticker labelling machine , bag sewing machine , bar coding equipment , bar reader machine , projector , laptop , public address audio system , pantry , desktop with accessorie , tv 45 inch screen , solar panel , bio fertilizer plant , cctv unit for control ) /bid number : gem/2026/b/7564787 * /dated: 26-05-2026 & & / bid document 1 / 42
Tender For corrigendum : supply and drained bed material/clinker handling in boilers. - loading of seived bed material in boiler from operating floor, spreading and leveling as per the direction of eic. the contractor has to arrange man power, if required during odd hours & sundays/ holidays, if required on emergency. frequency: as and when required., transportation of seived bed material , available in polythene bags, from ground floor to operating floor and coal scale area of boiler house and stacking it as per the direction of eic. frequency: as & when required., transportation of drained bed material, when boiler is in operation and drained clinker from boiler area to designated sieving area as per direction of eic. frequency: as and when required., collecting the bed material in polythene bags from areas wherever necessary for inspection of bed coils, wall tubes or for any other maintenance purpose and keeping the bed material either inside or outside of boiler bed, as per the direction of the eic. frequency: as and when required., removal of clinker from boiler 1 bed, using suitable methods without causing any damage to the bed coils/side wall tubes and transporting the removed clinker from the boiler to a specified area within 30 meters from ground floor of boiler house. after removal of clinkers, entire bed material and cleaning of nozzle distribution plates , all fluidization nozzles needs to be flushed out with compressed air and all nozzles needs to be pinned. frequency: as & when required., removal of clinker and bed material inside furnace (cross section 6.5m*6m) by engaging suitable manpower. location of clinker and bed material is between bed coils and fluidization nozzles. manpower engaged has to lie down between fluidization nozzles and bed coils and manually pass on clinker pieces to manholes available to be taken out. bed material can be drained through bed drains. since job to be executed is in constrained area, manpower engaged has to be physically fit. after removal of clinkers, entire bed material and cleaning of nozzle distribution plates, all fluidization nozzles of 4 compartments/ wind box needs to be flushed out with compressed air and all nozzles need to be pinned (pb# 2). frequency : as and when required.
Tender For pressure switches for furnace,pa header,seal air,hfo,lfo,atomizing steam and air and mill lube oil system and temperature switches for reducer lube oil system of mills.